The short version
- We buy truck terminals and cross-docks, truck and trailer parking lots, contractor and equipment yards and other outdoor storage lots, with or without buildings. In Pennsylvania, we also buy industrial land.
- In Philadelphia, the zoning code allows trucking terminals by right, with no special exception needed, in the I-1, I-2, I-3 and I-P districts. They aren't allowed at all in the ICMX and IRMX industrial mixed-use districts.
- Philadelphia bills stormwater by a lot's total area and its impervious area, such as roofs and pavement. By our arithmetic, a fully paved one-acre lot comes to about $711 a month at the rates in effect from September 1, 2026, before any credits.
- Fuel tank registrations have to be updated around a sale. Both states require an amended registration within 30 days after a change in ownership, and New Jersey also requires written notice at least 30 days before the sale.
- Buyers of industrial land in Pennsylvania look at what it would take to build on it: zoning, municipal land development approval, sewage planning and highway access.
A yard or terminal is mostly paved or gravel ground, so a buyer looks hard at the zoning, the surface, the stormwater rules and any fuel tanks. This page covers terminals, truck parking, contractor yards and storage lots in Philadelphia, its Pennsylvania suburbs and South Jersey, plus industrial land in our four Pennsylvania counties.
Our company is part of a family-owned business that has been operating for over 15 years. We buy yards and terminals as they stand, paved or gravel, leased or owner-used.
What counts as a truck terminal, truck yard or outdoor storage lot?
A truck terminal is a site for dispatching and storing trucks, with minor repair of the vehicles kept there, according to Philadelphia's use guide. Some have a cross-dock building. A truck yard or outdoor storage lot is mostly open land for parking or storing vehicles, equipment, containers or materials. The industry calls these sites industrial outdoor storage, or IOS.
CBRE describes an IOS property as "primarily outdoor land space, with a small portion of covered building space." Its list of IOS uses includes truck terminals, heavy equipment storage, container storage yards and bulk material storage yards. LaSalle Investment Management says buildings cover little of these sites, with a floor-area ratio (building floor space divided by land area) "of less than 20-25% but often zero."
| Site | What it's used for | What buyers look at |
|---|---|---|
| Truck terminal or cross-dock | Moving freight between trucks, dispatch and parking | Dock doors, the building, yard depth and maintenance bays |
| Truck and trailer parking | Parking tractors and trailers, overnight or longer | Surface, lighting, fencing and the route to the highway |
| Container and chassis yard | Storing containers and chassis near ports and rail | Surface strength and access for heavy loads |
| Contractor and equipment yard | Storing equipment, vehicles and materials | Zoning for outdoor storage, screening and the surface |
| Towing or impound lot | Holding towed or stored vehicles | Zoning approvals, security and fencing |
Is there demand for truck yards and outdoor storage lots?
Outdoor storage sites have been outperforming bulk warehouses nationally, according to Newmark. It reported in September 2025 that industrial outdoor storage (IOS) rents had risen 123% since 2020, more than twice the rate for bulk warehouses. It put IOS vacancy at about half the bulk warehouse rate. We found no IOS figures for Philadelphia or South Jersey from a named research firm.
Zoning keeps supply tight. Newmark wrote that well-located sites "remain scarce due to zoning." One takeaway CBRE posted for a July 2026 podcast episode on IOS made the same point: "Zoning restrictions limit IOS supply growth." On the same episode, CBRE's Will Pike said the majority of IOS inventory was built before 2000.
Truck parking is short too. The Federal Highway Administration's national truck parking survey, done under Jason's Law, said shortages "appear most pronounced along major trade corridors," including "States along the I-95 corridor." Those results date from 2015, so treat them as background. Our area sits on that corridor. Port terminals line both banks of the Delaware River, including PhilaPort's Packer Avenue Marine Terminal in Philadelphia and the Gloucester Marine Terminal in Gloucester City.
Where can a truck terminal or yard operate in Philadelphia?
Philadelphia's zoning table allows trucking and transportation terminals by right, with no special exception needed, in its I-1, I-2, I-3 and I-P districts. They aren't allowed in the ICMX or IRMX industrial mixed-use districts. Equipment and materials storage yards are allowed by right in every industrial district except IRMX, where they need a special exception.
| Use | Allowed by right | Special exception | Not allowed |
|---|---|---|---|
| Trucking and transportation terminals | I-1, I-2, I-3, I-P | None | ICMX, IRMX |
| Equipment and materials storage yards | ICMX, I-1, I-2, I-3, I-P | IRMX | None |
| Parking that doesn't serve a use on the lot | I-1, I-2, I-3, I-P | ICMX, IRMX | None |
| Moving and storage facilities | ICMX, I-1, I-2, I-3, I-P | None | IRMX |
The table comes from the Philadelphia Zoning Code's industrial use table, last amended in November 2025, and matches the City's February 2026 quick guide. Uses the table doesn't list are prohibited, and some uses carry extra standards elsewhere in the code. For a lot rented to outside truckers, the category matters. The use guide from the City's Department of Licenses and Inspections (L&I) puts "long-term or short-term storage of large vehicles" under trucking terminals, which ICMX and IRMX don't allow. Its non-accessory parking category covers parking that doesn't serve a use on the same lot. Ask L&I which category fits before relying on the parking row. Zoning maps change too. In June 2026, the City Planning Commission approved a bill that would rezone some ICMX land, where storage yards are allowed by right, to CMX-3, a commercial mixed-use district.
The code also has rules for the lot itself. Surface parking lots need a hard top surface or pervious pavement, which lets water through, and a continuous screen where a lot borders a residential district. A buyer will ask how those rules apply to your lot. Worn paving doesn't have to be fixed before you sell to us, and our page on a property that needs repairs covers how buyers look at it. Our Philadelphia page covers the city's industrial areas.
Outside Philadelphia, check the municipality's zoning, because a yard may need its own local approval. In Logan Township in Gloucester County, for one, premises in a commercial or industrial zone need a certificate of occupancy application before a new owner or tenant moves in. Our county pages for Bucks, Montgomery, Delaware, Camden, Burlington and Gloucester counties cover local rules and resale certificates.
How does Philadelphia charge for stormwater on a paved lot?
Philadelphia bills non-residential properties for stormwater by gross area and impervious area, such as roofs and pavement. At the rates in effect from September 1, 2026, a fully paved one-acre lot comes to about $711 a month by our arithmetic, before any credits. Credits for managing stormwater on site can lower the charge, within limits the Water Department sets.
From September 1, 2026, the Philadelphia Water Department charges $1.003 a month for each 500 square feet of gross area. Impervious area costs $7.048 a month for each 500 square feet. A $2.81 monthly billing and collection charge is added. An acre is 43,560 square feet, or 88 units of 500 square feet after rounding up. Our estimate assumes one account, full impervious cover and no credits.
Gravel isn't automatically exempt. The Water Department's rate schedule says impervious area includes surfaces that are "compacted or covered with material that restricts infiltration of water." Credits run for four years. There is no fee to apply, but renewing them carries a fee. The Water Department and the Philadelphia Industrial Development Corporation (PIDC) also award stormwater grants that can pay for retrofit projects on non-residential property.
A buyer that regrades, adds paving or replaces pavement down to the base may face the Water Department's stormwater rules. Milling and repaving that leaves the subbase in place isn't usually counted as earth disturbance. In the Water Department's stormwater manual, earth disturbance of 15,000 square feet or more triggers its post-construction stormwater requirements (5,000 in the Darby and Cobbs Creeks watershed). A project disturbing 5,000 square feet or more needs an erosion and sediment control plan.
Industrial stormwater permits are a separate question. Pennsylvania's general permit for industrial stormwater, PAG-03, was reissued effective March 24, 2023. A site may instead hold a No Exposure Certification, which requires all industrial materials and activities to be indoors or under roof. It isn't available in the state's High Quality or Exceptional Value watersheds. In New Jersey, a discharge of stormwater associated with industrial activity generally needs an NJPDES (New Jersey Pollutant Discharge Elimination System) permit. Our page on manufacturing plants covers how New Jersey's NJPDES permits change hands.
What happens to fuel tanks when a truck terminal sells?
A truck terminal's registered fuel tanks need their registrations updated when the property sells. Pennsylvania requires an amended registration within 30 days of a change of tank ownership. New Jersey requires written notice at least 30 days before the sale and an amended registration within 30 days after. Closing a tank later takes advance notice and a certified contractor in both states.
| Rule | Pennsylvania | New Jersey |
|---|---|---|
| Which tanks are regulated | Underground systems over 110 gallons with at least 10% below ground, and aboveground tanks over 250 gallons, with some exemptions | Underground tanks, except some small farm, home and heating oil tanks; non-residential motor fuel in any amount |
| Around a sale | Amended registration within 30 days after | Written notice at least 30 days before; amended registration within 30 days after |
| Closing a tank | Notice at least 30 days ahead, a certified remover and a site assessment | Notice at least 14 days ahead, a certified firm and a site investigation |
In Pennsylvania, the Department of Environmental Protection (DEP) regulates an underground tank system "greater than 110 gallons" when at least 10% of it is below ground. Registration costs $50 per underground tank per year. Closing a tank takes 30 days' notice and a DEP-certified remover, and closure isn't complete until a site assessment is done. Releases from regulated tanks follow the corrective action process of the Storage Tank and Spill Prevention Act, with cleanup levels set by Act 2, Pennsylvania's Land Recycling Program. The storage tank law also exempts some tanks, such as heating oil tanks used on the premises.
In New Jersey, the rules exempt farm or home tanks of 1,100 gallons or less holding motor fuel for noncommercial use. They also exempt heating oil tanks of 2,000 gallons or less used on site. A fact sheet from New Jersey's Department of Environmental Protection (NJDEP) lists motor fuel for non-residential use as regulated in "any amount." The rules also say a registration certificate isn't transferable, and the owner must notify NJDEP in writing at least 30 days before a sale or transfer. The notice of a planned closure is due at least 14 calendar days ahead.
A tank that leaked, or an old one nobody has tested, becomes part of the environmental review. Our page on environmental problems covers how buyers handle tank histories. In New Jersey, whether a trucking or storage business falls under the Industrial Site Recovery Act (ISRA) depends on several tests. One is its NAICS code, the federal code for its type of business. Our ISRA guide explains which businesses ISRA covers.
Leased yards and truck parking
Some yards earn rent from one tenant on a long lease. Others rent spaces to drivers and fleets month to month. Either way, a buyer will ask for the leases or parking agreements, a list of who pays what, and any deposits. What happens to month-to-month arrangements depends on what they say and on the buyer's plans.
Some owners weigh renting out spaces against selling the lot. Leasing keeps the land and the income, but it brings collection, security and upkeep. A written offer gives you a number to compare against that income. Our page on selling with tenants in place covers leases, estoppel letters and deposits at closing.
If your own trucking or contracting company runs on the lot, we buy the real estate, not the company. The company can move, close or stay as a tenant, with the lease terms written into the deal. Our page on sale-leasebacks explains how that works.
What does a buyer check on industrial land in Pennsylvania?
A buyer of Pennsylvania industrial land checks the zoning first, then what it takes to develop the site. In the suburban counties, that can mean municipal land development approval and a county planning review. It can also mean sewage facilities planning under the state's Act 537 and a permit from PennDOT, the state transportation department, for a driveway onto a state highway.
In the suburban counties, Pennsylvania's Municipalities Planning Code (MPC) gives municipalities the authority to regulate land development and subdivision. Lower Merion Township in Montgomery County, for example, sets no square-footage threshold for land development; its director of building and planning decides when a project counts. The MPC also requires land development plans to go to the county planning commission for review. In Bucks County, the planning commission says it must finish its review within 30 days of a complete submission.
When a new land development is proposed, DEP says the municipality has to revise its official sewage plan unless the project is exempt. New land development also needs a sewage planning module, the paperwork showing how the project's sewage will be handled, with some exceptions.
Check, too, whether the land is enrolled in Clean and Green, Pennsylvania's preferential tax assessment program. The state Department of Agriculture says a landowner who breaches the program's covenant is subject to seven years of rollback taxes at 6% interest a year. Ask the county assessment office whether a sale and a new use would trigger them.
An industrial buyer checks truck access closely. A new or changed driveway onto a state highway needs a PennDOT highway occupancy permit.
Land with an industrial past brings environmental questions. Pennsylvania's Act 2 sets the cleanup standards a buyer will ask about, and our page on environmental problems explains how Act 2 works when you sell. In Philadelphia, the zoning table above shows which industrial districts allow terminals and yards. Our county pages give the local market figures for Bucks, Montgomery and Delaware counties.
What to have ready
- A survey or site plan, with the acreage and the usable area
- The surface (paved, gravel or mixed), fencing, lighting and gates
- The zoning, any approvals, and the certificate of occupancy for any building
- Leases, parking agreements and a list of current tenants or customers
- Recent stormwater bills, any credits, and any industrial stormwater permit
- Fuel tank registrations, test results and any closure reports
- Environmental reports, if you have them
- For land: any plans, approvals, sewage planning or driveway permits, and whether it's enrolled in Clean and Green
Selling a yard or terminal to us
Send the address and the acreage, if you know it. We walk the site with you, look at the surface, the access and any buildings, and ask about leases, tanks and permits. You then get a written as-is offer that names the price, a proposed closing date and each side's costs. We charge no commission and no fees.
We can't promise a set number of days. When you sell to us, you choose the date, within the required steps and the due diligence period in our offer. For a yard or terminal, expect a zoning check and a review of the tank records among those steps, plus any ISRA filing in New Jersey. How It Works covers each step. See everything we buy for other property types, and our page on a vacant building or a tenant leaving if the terminal is emptying out.
Sources
- CBRE: Industrial outdoor storage and The Weekly Take podcast: Industrial outdoor storage takes off (July 14, 2026)
- LaSalle Investment Management: The emergence of land-driven logistics real estate (June 17, 2025)
- Newmark: Lots to Gain, industrial outdoor storage (September 8, 2025)
- PhilaPort: Packer Avenue Marine Terminal and Holt Logistics: Gloucester Marine Terminal
- Federal Highway Administration: Jason's Law truck parking survey and release (August 21, 2015)
- Philadelphia Zoning Code § 14-602, Table 14-602-3 and City of Philadelphia: Zoning Code base districts quick guide (February 2026)
- City of Philadelphia, L&I: Use Classification Guide (February 2024) and City Planning Commission minutes (June 4, 2026)
- Philadelphia Zoning Code: § 14-803(4), parking lot surfacing and § 14-803(5), parking lot landscaping and screening
- Philadelphia Water Department: non-residential stormwater billing, rates and charges (FY 2026 and 2027), stormwater credits, stormwater grants and Stormwater Management Guidance Manual, chapter 1
- Pennsylvania DEP: Industrial stormwater and N.J.A.C. 7:14A-24.2 (Justia)
- Pennsylvania DEP: underground storage tanks, registering a storage tank and reporting a tank closure; 25 Pa. Code § 245.452 (Cornell LII), 25 Pa. Code § 250.2 (Justia) and the Storage Tank and Spill Prevention Act (1989 text, DEP copy)
- N.J.A.C. 7:14B (Justia): 1.4, exemptions, 2.1, registration, 2.3, change in ownership and 9.2, closure; NJDEP: Regulated UST fact sheet (2012)
- Logan Township Code, Chapter 119, Article II (commercial and industrial zones)
- Lower Merion Township: Subdivision and land development and Bucks County Planning Commission: Planning InSight (May 2019)
- Pennsylvania DEP: Act 537 sewage facilities planning and PennDOT: Highway occupancy permits
- Pennsylvania Department of Agriculture: Clean and Green
The figures and rules on this page come from the sources listed here, last checked in October 2026. Zoning, rates and tank rules change, so confirm them for your property with the city, town or state.
